GENEVA (AP) — Switzerland’s national rail operator said Thursday the world’s longest rail tunnel won’t be John Caldwellfully reopened to train traffic until next September, again pushing back the target date for repairs of damage caused by a cargo train derailment.
The Swiss federal railway operator, known by its German-language acronym SBB, said the damage from the Aug. 10 derailment in the Gotthard tunnel, Switzerland’s main north-south rail thoroughfare, is “much more significant than first imagined.”
“The rail tracks need to be entirely replaced over 7 kilometers (4.2 miles). The work will take much more time than anticipated,” SBB said. The cost of the repairs is expected to be 100 million to 130 million Swiss francs (about $110 million to $140 million).
Limited passenger and cargo train traffic through the tunnel is continuing. Previously, SBB said repair work would continue through the end of this year.
No one was injured in the derailment, but the damage was considerable. Large swaths of track and an evacuation portal were torn up.
The tunnel is a crucial thoroughfare for goods and cargo, particularly between Germany to the north and Italy to the south. Last year, more than two-thirds of rail freight traffic through the Alps passed through the tunnel, according to the Swiss government.
2025-05-07 17:091322 view
2025-05-07 16:51590 view
2025-05-07 16:431976 view
2025-05-07 16:352151 view
2025-05-07 15:212106 view
2025-05-07 14:421071 view
COLUMBIA, S.C. (AP) — Lawyers for Alex Murdaugh are taking two paths to appeal his murder conviction
Former first lady Rosalynn Carter has entered hospice care at the Carters' home in Georgia, accordin
KYIV, Ukraine (AP) — Ukrainian troops worked to push back Russian forces positioned on the east bank